CONWAY-PHILLIPS HOLDING, LLC
PETROLIA, PA
| Inspections With Violations | 1 |
| Total Citations | 6 |
| Total Penalties | $59,581.00 |
| Most Recent Case | November 22, 2025 |
November 22, 2025 · Fatality/Catastrophe
OSHA case 348612102
29 CFR 1926.403(b)(2) · Serious · $16,550.00
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA: On or about November 22, 2025, the employer did not ensure the 120 volt circuit of the Powermate DP25 Electric Distribution Panel was GFCI protected. While in the process of securing a clamp on the Automated Girth Welder, employees were exposed to electrical shock hazards of energized 120V electrical equipment that was not GFCI protected.
Contested June 11, 2026 - not yet finalized.
29 CFR 1926.404(b)(1)(ii) · Serious · $0.00
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection. (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA : On or about November 22, 2025, the employer did not ensure the 120 volt circuit of the Powermate DP25 Electric Distribution Panel was GFCI protected. While in the process of securing a clamp on the Automated Girth Welder, employees were exposed to electrical shock hazards in that the 120V equipment on the Automated Girth Welder was energized which caused the framing and other parts of the Automated Girth welder to become energized.
Contested June 11, 2026 - not yet finalized.
29 CFR 1926.404(f)(6) · Serious · $16,550.00
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA: On or about November 22, 2025, employees were exposed to an electrical shock hazard while using equipment such as an Automated Girth Welder (AGW), to weld a tank and the AGW was powered by a MQ Power Whisper Quiet Generator Model: DCA 220SSVU where the path to ground was not continuous in that the ground cable had broken strands. (b) Jobsite, 100 Sonneborn Lane in Petrolia, PA: On or about November 22, 2025, employees were exposed to an electrical shock hazard while handling an Automated Girth Welder (AGW), where the 120 Volt trolley used to drive the AGW was energized and powered by a MQ Power Whisper Quiet Generator Model: DCA 220SSVU where the path to ground was not continuous in that the ground cable had broken strands.
Contested June 11, 2026 - not yet finalized.
29 CFR 1926.416(e)(1) · Serious · $16,550.00
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used: (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA : On or about November 22, 2025, the employer did not ensure all cables on the Automated Girth Welder (AGW) were free from any damage. The cable between the AGW trolly motor and the control panel was damaged with outer insulation torn showing wires inside, exposing employees to electrical shock hazards as the AGW was secured to be stored.
Contested June 11, 2026 - not yet finalized.
29 CFR 1926.451(a)(1) · Serious · $9,931.00
29 CFR 1926.451(a)(1): Each scaffold and/or scaffold component was not capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it: Note: Exceptions are provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section. (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA : On or about November 22, 2025, the employer did ensure the Automated Girth Welder (3 O'clock) was capable of supporting at least 4 times it's intended load while employees were working inside to weld a industrial size storage tank. There was no load capacity or any kind of manufacture markings or labels on the Automated Girth Welder as to the load capacity of the equipment and personnel inside.
Contested June 11, 2026 - not yet finalized.
29 CFR 1926.502(d)(15) · Serious · $0.00
29 CFR 1926.502(d)(15): Anchorages used for attachment of personal fall arrest equipment were not independent of any anchorage being used to support or suspend platforms and/or were not capable of supporting at least 5,000 pounds (22.2 kN) per employee (a) Jobsite, 100 Sonneborn Lane in Petrolia, PA : On or about November 22, 2025, the employer did ensure the fall arrest equipment of Automated Girth Welder/AGW was capable of supporting at least 5,000 pounds. Two employees were working inside of the AGW, there was only one approved tie off anchorage point in the AGW. The second employee was tied off to the top guardrail of the AGW basket.