What OSHA Found

OSHA inspected Len Contractors, Inc. at a residential construction site in Ridgely, Maryland, opened September 22, 2025. The company was cited 15 times across a wide range of fall protection, PPE, and site safety standards, with as many as 15 workers exposed on individual citations. Three citations were classified Willful: failing to ensure workers were tied off under 29 CFR 1926.501(b)(11) (steep roof fall protection, $17,500), a fall protection training gap under 29 CFR 1926.503(a)(1) ($20,000), and missing guardrails on stairways under 29 CFR 1926.1053(b)(1) ($20,000). Four more citations were classified Repeat.

From Repeat to Willful, One Year Later

Len Contractors was cited for nearly the same standards, failing to ensure workers were tied off, missing fall protection training, and inadequate PPE, at an Easton, Maryland worksite opened July 29, 2024, with a final order entered August 19, 2024. Those citations were classified Repeat. A little over a year later, the identical standards at the Ridgely site were classified Willful rather than Repeat, OSHA's conclusion that the company had already been formally told about these exact gaps and chose not to fix them.

A Long, Active Enforcement History

OSHA's own enforcement data shows Len Contractors inspected at Maryland worksites going back to 2017, across at least nine different towns, with two more inspections opened after this one, in Easton (December 2025) and Centreville (October 2026). One citation in this case, coded 05-104(A), is issued under Maryland's own state licensing law rather than a federal OSHA standard.

The Penalty

The 15 citations total $97,000. No contest date is on record, and all citations became a final order February 23, 2026.

Why Willful Replaces Repeat, Not Just Adds to It

A citation doesn't become Willful simply because a company has been cited before, that alone is what Repeat already covers. It becomes Willful when the record shows the employer knew about the exact requirement, from its own prior final order, and declined to comply anyway. Len Contractors' Easton case closing in August 2024 and the identical standards reappearing as Willful at a different site thirteen months later is close to a textbook example of that distinction.